Substation and padmount units built to the interconnection spec

An interconnection is the one project where the specification is not yours alone — the utility's requirements on impedance, tap range, protection and test evidence are conditions of energisation. Equipment that cannot produce the paperwork does not get connected.

What drives the specification

The spec is written by someone else

Voltage class, impedance, tap range, vector group and accessory list usually arrive from the utility rather than from the buyer. Substation and power transformers here are made to order against exactly that document, two- or three-winding, typically 2 to 60 MVA and up to 110 kV class, with de-energized taps or a full on-load tap changer as the spec requires.

Test evidence is part of the deliverable

Routine tests run per IEEE C57 or IEC 60076 in a CNAS-accredited transformer test station — ratio, resistance, impedance, losses, applied and induced voltage. Medium- and high-voltage units additionally pass through a shielded partial-discharge test room. Factory acceptance testing can be witnessed remotely, which removes a trip from the schedule without removing the verification.

Impedance is a system decision

Impedance sets the available fault current at the secondary and therefore the interrupting duty on everything downstream. It is quoted against your written specification rather than picked from a standard list, and the one-line gets an engineering review before any number is committed.

Typical specification

Substation units
Liquid-immersed, two- or three-winding, typically 2–60 MVA
Voltage class
Up to 110 kV class, confirmed at engineering review
Cooling
ONAN / ONAF
Tap control
De-energized taps or on-load tap changer (OLTC)
Accessories
Conservator, Buchholz relay, gauges, monitoring per spec
Distribution side
UL-listed padmount, 45–4,000 kVA, file E526441

What to send us

Send the utility's specification document and the one-line. Impedance, tap range and the accessory list are quoted against it directly, and the engineering review comes back with the quote rather than after the order.